Case Study: Flexi-Flipper at UK Port

 Ports: Installation and Trial of Flexi-Flipper   Reduction of the number of flippers to be repaired, either due to breakage or deformation. Reduction of damages on the system or the structure of the spreader. Reduction of damages on the vessel’s bays. Absorption of impacts on the container and its cargo. Reduction of downtime during operations. […]

Revolutionary Flexi-Flippers for the ports industry

Extensive trials of revolutionary flippers for STS cranes are imminent in the UK. The performance and success of the age-old problem-solving solution shall pave the way for a time-saving, cost-efficient, high performance product for the UK’s ports industry. The trials have been negotiated, agreed and shall be supplied and installed by Barlow Technology Ltd, the […]

Flexi-Flipper Trials

Trials of the new Barlow Technology supplied Flexi-Flippers are underway at DP World, London Gateway. First round testing was completed towards the end of last year and this week, a new adaptable design of corner flippers with a square polymer block has replaced the original V-shaped profile, making the second round flippers much stronger. Confidence […]